3D Industrial Engineering | temp
2
archive,author,author-temp,author-2,ajax_fade,page_not_loaded,,qode_grid_1200,qode-child-theme-ver-1.0.0,qode-theme-ver-13.0,qode-theme-bridge,wpb-js-composer js-comp-ver-5.4.4,vc_responsive

Author: temp

Industrial Fittings engineered the bridge dampeners that went into the state of the art JPL Distribution Centre which consolidates the warehousing for all of the James Pascoe Group including Farmers, Whitcoulls, Stevens and Pascoes.  The construction achieved world leading floor flatness for a facility that contains cutting edge 16m high...

Industrial Fittings engineered the bridge dampeners that went into the ‘new’ Wyley’s Bridge that connects the Mangamahu community to the Whanganui district.  More than 100,000 sheep, 5,000 cattle, 500 tonnes of wool, 600 tonnes of kiwifruit, 1,000 tonnes of maize and 2,000 tonnes of fertilizer will travel over the bridge...